ZAPP-ZIMMERMANN GmbH
MenuSearch
Close
  • Firestop Systems: ETA
    • Penetration Seals
      • Mixed Penetration Seals
      • Cable Penetration Seals
      • Pipe Penetration Seals
      • Fire Protection Joint Seals
  • Firestop Systems: UL
    • Penetration Seals
      • Mixed Penetration Seals
      • Cable Penetration Seals
      • Pipe Penetration Seals
      • Blank Opening
  • Industry
    • Rail
      • Certified safety for rail vehicle construction
      • Applications
      • Products
      • Construction materials & components
      • Classification and standards
    • Further business areas
      • Ventilation
      • Sanitary, Gas, Heating
      • Electronics
      • Maritime
  • Development
    • Services of ZAPP-ZIMMERMANN GmbH
    • Support in development and approval processes
    • Application examples for the intumescent behaviour
    • Positive material properties combined with fire resistance
    • Manufacturing of fire protection powder
    • Overview - Building materials
  • Company
    • History
    • Certified safety
    • National and international approvals
  • Downloads
    • Building construction
    • Industry
  • Contact
  • Partner
  • YouTube
  • Facebook
  • Bauspot.de
  • Xing
  • LinkedIn
  1. Innovative Fire Safety Systems
  2. Firestop Systems: UL
  3. Penetration Seals
  4. Mixed Penetration Seals
Filter By
Filter By

Filter

Approved installations
  1. System No. C-AJ-8233 Mixed penetration seal in solid wall or floor

    C-AJ-8233
    • Cable bundle up to 4 in. diameter, metal pipes up to 4 in. diameter optionally glass fiber insulated
    • F-Rating: 2 h; T-Rating: 1/4 h, 1-1/4 h and 1-3/4 h
    • Floor or wall of min. 4-1/2 in. thick reinforced concrete or any UL Classified Concrete Blocks

    View Detail

  2. System No. C-AJ-8234 Mixed penetration seal in solid wall or floor

    C-AJ-8234
    • Cable bundle up to 4 in. diameter, metal pipes up to 4 in. diameter optionally glass fiber insulated
    • 2 h and 2 h
    • Max. opening size: 384 in.² with a max. dimension of 32 in.
    • Floor or wall of min. 4-1/2 in. thick reinforced concrete or any UL Classified Concrete Blocks
    • Annular space: point contact to max. 7-7/8 in.
    • ZZ® 365 Fire Protection Sealant to be filled between cables, in voids between cables/pipes and ZZ® 260 Fire Protection Block and between periphery of opening and ZZ® 260 Fire Protection Block

    View Detail

  3. System No. C-AJ-8235 Mixed penetration seal (AC lineset) in solid wall or floor

    C-AJ-8235
    • Up to four metallic pipes optionally AB/PVC insulated and one PVC/CPVC pipe each up to 1 in. diameter, four cables
    • 4 h and 2 h
    • Maximum diameter of opening is 6 in.
    • Floor or wall of min. 4-1/2 in. thick reinforced concrete or any UL Classified Concrete Blocks
    • Annular space: point contact to max. 2 in

    View Detail

Stay informed with the free newsletter of ZAPP-ZIMMERMANN GmbH

Subscribe now

Sign up
Profi Chat



Stay informed with the free newsletter of
ZAPP-ZIMMERMANN GmbH


Subscribe now

Overview

  • Imprint
  • Legal Notice
  • General Terms and Conditions

Contact

ZAPP-ZIMMERMANN GmbH
Marconistraße 7-9
50769 Cologne - Germany

fon: +49 221 97061-700
support: +49 221 97061-720
fax: +49 221 97061-929

Contact form

Certified

TÜV Rheinland